-
The 3 building, 150,000 sq. ft. Calabasas headquarters office park adjacent to
Malibu Canyon Business Park, was built in 1990. Fronting on the 101 Freeway on
Agoura Road, just west of the Las Virgenes exit, it has consistently boasted
occupancy in excess of 90% and commanded some of the highest rent levels in the
West San Fernando Valley/Conejo Valley market. Known as the 101 Technology Corridor
in recognition of its heavy concentration of high-tech firms, the L.A. Business
Journal named the Park as one of the five best buildings in Los Angeles
for high tech tenants. All 7 buildings in the overall office park are interconnected
by fiber-optic cabling, enabling tenants to expand within the park while maintaining
their existing telecom and data services. Tenants have included a mix of major
public companies and high-tech firms such as Grant & Weber, Informa and IXIA.
Corporate Center offers a park-like setting with extensive
landscaping and The Johnston Group's signature artwork and water features, including
cascading waterfalls, streams and fountains. The on-site Company Café serves
breakfast and lunch and provides catering for company functions. Club Fit is
available to tenants throughout the day and evening, offering private training
sessions, aerobic classes and the most modern equipment available. Both surface
and street parking is available in addition to covered subterranean garages.
The individual office suites offer many standard features
not found in most competitive properties. These consist of parabolic lighting
to ease eyestrain and state-of-the-art HVAC systems that provide for greater
air exchange, substantially eliminating air pollution, which causes drowsiness. High speed internet service is available throughout the park.
All of these features help to increase tenant productivity, and make for a highly
enjoyable work place.
This property was sold in November of 2006 with The Johnston Group retaining management.
Later this year, Landmark Square, a three-story 50,000 sq. ft. building & parking
garage will be built on the remaining pad, fronting directly on the 101 Freeway.
This third and final phase will be a truly Class A building, comparable to the
finest available in the market.
back to top |